Tuesday, July 12, 2016

PMU Board Reports PWR_MAJ_ALM Due to Unfavorable Power Supply Environment

The PMU board reports a PWR_MAJ_ALM alarm due to unfavorable power supply environment.

Product

OptiX Metro 6100, OSN6800,OSN8800

Fault Type

Power Supply
PWR_MAJ_ALM

Symptom

When commissioning a network, field engineers find that the T2000 indicates that the input voltage of an OptiX Metro 6100 NE is excessively high (reaches -79.6 V). In this case, the PMU board reports a PWR_MAJ_ALM alarm to the T2000. However, after measuring the input voltage by using a voltmeter, the field engineers find that the input voltage is within the normal range (the measured voltage is -53 V).

Cause Analysis

The possible causes of this problem are as follows:
  • The PMU board is faulty.
  • The power supply environment is unfavorable.

Procedure

  1. Replace the PMU board. The problem persists.
  2. Measure the input voltage by using a broadband oscilloscope, finding that the input voltage (-53 V) contains high frequencies with the amplitude up to 80 V. Thus, the PMU board cannot identify the input voltage. As a result, the PMU board works abnormally and reports a PWR_MAJ_ALM alarm.

Result

The problem is resolved.

Failing to Add IMA Boards into the DPS Protection Group

IMA boards fail to be added into the DPS protection group, hence failing to realize the DPS protection.

Fault Type

Configuration_Problem

Symptom

Boards fail to be added into the DPS protection group.
The configuration of the DPS protection fails to be performed. The boards fail to be added into the DPS protection group.

Cause Analysis

IMA boards that are added into the DPS protection group must be inserted in the paired slots.

Procedure

  1. Make sure that the IMA boards that are configured with DPS protection are set to the paired slots.

T2000 Reports Errors After the Standard Optical Power of Single Wavelength Is Set to 7 dBm with ALC in Power Reference Mode

The T2000 reports errors after the standard optical power of a single wavelength is set to 7 dBm when ALC is in power reference mode.

Product

OptiX Metro 6100
OptiX Metro 6040

Fault Type

Automatic Level Control (ALC)

Symptom

In a network, the ALC function is configured for the OptiX Metro 6100 by using the iManager OptiX T2000. The network consists of five stations organized in OTM--OLA--OLA--OLA--OTM sequence. The OBU05 optical amplifier board is used at the transmit end of the first station and the ALC working mode of the station is set to Power Reference mode. Standard Output Power For Single Wavelength (dBm) of the OBU05 board is set to 7 dBm and that of other optical amplifier boards is set to 4 dBm.
After the settings are applied to the optical amplifier boards, the T2000 reports that these boards have different standard output power of single wavelength.

Cause Analysis

After an analysis, it is found that Standard Output Power For Single Wavelength (dBm) does not refer to the standard output optical power of a single wavelength on an optical amplifier board at a station when ALC is in Power Reference mode; instead, it refers to the standard output optical power of a single wavelength in the system. The standard output optical power of a single wavelength in the system is independent of an optical amplifier board but depends on the number of wavelengths in the system.
When there are 40 wavelengths in the system, Standard Output Power For Single Wavelength (dBm) must be set to 4 dBm; when there are 80 wavelengths, Standard Output Power For Single Wavelength (dBm) must be set to 1 dBm. In addition, the Standard Output Power For Single Wavelength (dBm) parameter for each station must be set to the same value. You cannot set this parameter for a station according to the standard output optical power of a single wavelength on an optical amplifier board.

Procedure

  1. The OptiX Metro 6100 is a 40-wavelength system. Thus, set Standard Output Power For Single Wavelength (dBm) for the OptiX Metro 6100 to 4 dBm when the ALC function is in power reference mode.

Result

The problem is resolved.

Monday, July 11, 2016

Manually Configuring Services Fails on the T2000 Due to Incorrect Configuration of Service Capacity

Manually configuring service fails on the T2000 due to incorrect configuration of service capacity.

Product

Fault Type

Others

Symptom

The OptiX OSN 8800 master subrack connects to four OptiX OSN 6800 slave subracks and one OptiX OSN 8800 slave subrack. Configuring the ODU2 service between the TQX and NQ2 boards in the master subrack is successful. However, in the process of configuring a service between slave subracks, the system prompts that the service type in the license is incorrect. In this case, the version of the SCC board is 5.51.4.24 and the version of the NMS is iManager T2000 V200R007C03.

Cause Analysis

The service capacity of the OptiX OSN 8800 master subrack is 1.28T.
The possible cause of this problem is that the service capacity of the master subrack is set incorrectly on the T2000.

Procedure

  1. Exclude the possibility that the service type of the master subrack is set incorrectly on the T2000 as configuring a service on the master subrack is successful.
  2. At the station, analyze the service data of each slave subrack and then reconfigure the service data by running a command line, finding that the reconfigured serviced data is applied successfully to each slave subrack. This indicates that the service data of each slave subrack is set incorrectly on the T2000.
  3. On the T2000, check the service data and find that the service capacity of the OptiX OSN 8800 slave subrack is different from that of the OptiX OSN 8800 master subrack. Then, delete the OptiX OSN 8800 slave subrack and re-create the slave subrack. In addition, select 1.28 as the service capacity of the slave subrack. After that, configure the service for the slave subrack on the T2000. At this point, the configuration is successful.

Result

The problem is resolved.

LINK_ERR Occurs Due to an Optical Module Fault on the TQX Board

This section describes how to remove the LINK_ERR alarm resulting from an optical module fault on the TQX board.

Product

Fault Type

Tributary Unit and Line Unit
LINK_ERR

Symptom

There are two channels of point-to-point 10G LAN services between station A and station B in a network. The TQX tributary board and NQ2 line board are used at either station. After the network connects to a router, it is found that both station A and station B report the LINK_ERR alarms in one channel of 10G LAN services. As a result, this channel of 10G LAN services is interrupted. However, the other channel of 10G LAN service runs normally.

Cause Analysis

The possible causes of this problem are as follows:
  • The working mode of receive optical interface on WDM side the NQ2 board at the local station is different from the working mode of the transmit optical interface on the WDM side of the NQ2 board at the opposite station.
  • The link is faulty.
  • Optical fiber connections are incorrect.
  • The opposite equipment is faulty.
  • The input optical power of the client-side optical interface on the TQX board is excessively high or low.
  • The working modes of the optical interfaces on the client side of the TQX board are inconsistent.
  • The board at the local station is faulty.

Procedure

  1. Exclude the possibility that working modes of the optical interfaces on the client side of the TQX board are inconsistent since the TQX board has no PHY chip.
  2. Check the client-side optical power on the TQX board, finding that the receive optical power on the client side of the TQX board at station A is -6.7 dBm and that at station B is -8.1 dBm. Both of the receive optical power values are in normal range.
  3. Make sure that the chip for detecting link status information is located behind the cross-connect chip since the TQX board has no Layer 2 chip. Then, configure an inloop on the client side of the NQ2 board at each of station A and station B, finding that the LINK_ERR alarm on the TQX board at station A is cleared but the LINK_ERR alarm on the TQX board at station B persists.
  4. Perform a cold reset on the TQX board at station B. The LINK_ERR alarm persists.
  5. Replace the optical module at optical interface 3 on the client side of the TQX board at station B, finding that the LINK_ERR alarm is cleared.
  6. Release the inloop at stations A and B. At this point, the LINK_ERR alarm is cleared and normal connection between the network and the router is achieved.

Result

The problem is resolved.

Sunday, July 10, 2016

How to Use the Ethernet Test Frames on the OptiX OSN 6800

This section describes how to use the Ethernet test frames on the OptiX OSN 6800.

Fault Type

Others

Symptom

None.

Cause Analysis

Using Ethernet test frames is a major method of determining whether the service configuration on a data board is correct. Certain boards intended for the OptiX OSN 6800 support this feature. The following section takes the LOG and TDG boards as examples to describe Ethernet test frames.
  • Whether electrical cross-connections need to be configured when the LOG board is used to test Ethernet services?
    Whether electrical cross-connections are configured does not affect the Ethernet service test on the LOG board. The LOG board can receive response test frames under the condition that optical path between the local and opposite LOG boards is available.
  • If the local and opposite TDG boards cross-connect services to the local and opposite LOG boards respectively, can the local TDG board receive response test frames?
    Electrical cross-connections are configured from the TDG board to the WDM side on the LOG board. The local TDG board cannot receive response test frames because the local LOG board also supports test frames. Even an inloop is performed at the optical interfaces on the WDM side of the local LOG board, the local TDG board cannot receive the test frames sent from the local TDG board.
    To enable that a TDG board receives test frames, cross-connect the services on the local TDG board to the local NS2 board, and then the opposite NS2 board cross-connects the services to the opposite TDG board. That is, electrical cross-connections must be configured when a TDG board tests the Ethernet services.

Procedure

  1. None.

Result

The problem is resolved.

Friday, July 8, 2016

Power Cables Must Be Selected According to the Actual Maximum Power Consumption When Junction Boxes Are Used

Power cables for the OptiX OSN 6800 system must be selected according to the actual maximum power consumption when junction boxes are used.

Product

Fault Type

Power Supply

Symptom

An OLA station in a network is configured with two subracks and two CRPC subracks. Due to an engineering survey error, only two 15 m long power cables with the core diameter 16 mm2 are provided as the active and standby external power cables. Four output power supplies, however, are required in field. Therefore, one more power cable or a junction box is required.
In addition, there are only two input terminals of 63 A circuit breakers in the telecommunications room of the customer.

Cause Analysis

The PDU on the OptiX OSN 6800 is divided into active and standby areas. Each area has two input power supplies and six output power supplies.
The mapping relationship of the input and output power supplies is as follows:
  • Input power supply 1: output power supplies 1, 2, and 3
  • Input power supply 2: output power supplies 4, 5, and 6
When more than three output power supplies are required, two input power supplies or junction boxes are required.
The configuration of the OLA station is simple and the maximum power consumption does not exceed 2400 W. In addition, -63 V power supply is used. Therefore, two 63 A circuit breakers can satisfy the power supply requirements. When power cables with the core diameter 16 mm2 are used, a junction box can be used to implement the two input power supplies under the following conditions:
  • The total power consumption is lower than 2500 W.
  • The distance between the power cable and the power distribution cabinet is shorter than 20 m.
  • The normal ambient temperature is lower than 40°C.
After an analysis of the field environment, it is determined that the power supply problem can be resolved by adding a junction box.

Procedure

  1. None.

Result

The problem is resolved.